wbviet_đánh bài online_link m88

This was a challenging project with many facets to consider during the entire process. The project was to include renovating the lobby and adding a second story conference facility. Relocate the reception area, install a new front entrance revolving door and an elevator for wheelchair access to the second floor all while the hotel was still operational.